| |
|
M.B.
(Bruce) Woytuik
Career Summary:
I have over thirty (30) years experience in Information Technology with a number of
highly diverse organizations including; Federal and Provincial Government
Departments, Post Secondary Educational Institutions, Health Care, Mining, Engineering,
Telecommunications, Energy Utility and Wholesale / Retail Industries.
For the last thirteen (13) years I have been an Independent Consultant contracting
with large firms like IBM Canada Ltd., Sierra Systems Ltd., CGI and
Pricewaterhouse Coopers or
contracting directly with clients.
My responsibilities have
included System Operations and Management, Interim Management, Systems Design / Architecture,
Project Management, Applications Development, Training and Teaching. I
have extensive experience in the management and operation of Information
systems, System Security, Networking, Training and Technology Management.
I specialize
in the planning, implementation and operations start up of new systems
and Operations Management, It organization restructuring and Interim
Management.
Expertise:
 |
IT Organization
Restructuring and Interim Management..
|
 |
Project and Operations
in multiple vendor Information Systems environments.
|
 |
ITIL processes and best
practices. |
 |
Non-interruptive
Implementation planning and execution. |
 |
Operations start up planning, implementation
and operations transition. |
 |
Operational auditing of current and proposed
systems. |
 |
Operational perspective in Business System
Design, Technical Design, Systems Architecture and Organizational
Re-engineering. |
 |
Computer Managed Learning systems and
their use in both local and Distance Education activities.
|
Consulting Experience:
Core Network
Solutions - April 2009 -
August 2009
Project Management
& Mentoring
 |
Assisted in the analysis and preparation of the RFP response for Edmonton Airports (EA) Network Consolidation; a 5 million dollar project that is part of the airport expansion project which was won by Core Network Solutions. |
 |
Acted as the PMO for Core Network Solutions and liaised with the EA Project Manager to track project schedules and deliverables. |
 |
Mentored Core Network Solutions personnel on managing a fixed price contract. |
Alberta Medical Association
- May 2005 - March 2007
Operations & Security Management
 |
Conducted Medical Clinic assessments to document and
report on the system management practices of Medical Clinics in the
Province |
 |
Conducted Privacy Impact assessments, developed
policies and procedures for Medical Clinics in the Province |
British Columbia Ministry of Health - November 2005 - December 2005
Operations Management & Project Planning
 |
Conducted
assessment of current service delivery practices and a high level project review
|
 |
Made
recommendations on implementing ITIL best practices, organizational
change and a transition / implementation plan
|
 |
Made
recommendations on project management changes
|
City of Calgary - June 2004 - September 2004
Operations Management
 |
Conducted
interviews and data gathering to document and report on the
Functional Maturity of the City of Calgary as part of an IT
Benchmark and Total Cost of Ownership (TOC) contract with
Micromation. |
GNWT - Financial Management Board Secretariat - July 2002 - March 2003
Project Management - Operations & Infrastructure
 |
Conducted interviews and data gathering to document the Business Case for consolidating the Government of the North West Territories
Information Technology support into a shared services model |
 |
Worked closely with PwC subject matter specialists to
analyze the data gathered and to develop an implementation strategy |
 |
Prepared a business case and implementation plan to support the conversion to a shared services model
|
 |
Implementation
of the GNWT Technical Service Centre (shared IT services
organization), including staffing, facilities renovation, support
software selection, rollout planning and a charge back system
|
 |
Advisory
and consulting services during Departmental transition
|
ENMAX - February 2002 - March 2002
Project
Management - Operations & Infrastructure
 |
Provide
operations risk assessment on the ENMAX take over of Enron direct
billing system |
 |
Prepared
and successfully executed the plan to build the infrastructure, facilities,
contract and transition Enron staff to ENMAX in 3 weeks
|
 |
Managed
the operations transition from Enron to ENMAX and produced the first
invoices 4 days after the transition
|
 |
Initiated
project to integrate / convert Enron systems to ENMAX systems
|
 |
Stabilized
the operations environment |
CGI - October 2001 - November 2001
Business & Operations Analysis
 |
Conducted
an independent operational audit for CGI assessing performance on
a client contract and recommending changes to the contract for
both parties |
 |
Reviewed
operational risks and remedial priorities for a new CGI managed operations
contract |
 |
Provided
a high level risk assessment to the client and recommended action
plan
|
GNWT, Health and Social Services - January 2001 - August 2001
Interim Management
 |
Provide
technical and operations management support to the GNWT, Department
of Health & Social Services as the Acting Manager, Information
Systems |
 |
Managed
Helpdesk and Desktop Support Specialists (5) and Training Specialists
(3) |
 |
Assisted
in managing Applications Development and Support personnel (7)
|
 |
Implement
a complete network redesign |
 |
Implemented
a server build standard and reduced the number of servers by 50% through
consolidation |
 |
Implemented
a new Desktop standard using Office 2000 and Outlook 2000 throughout
the Department and Regional sites (800+ workstations) |
 |
Developed
a workstation standard and policy that included workstation lock down
|
 |
Developed
Operations policies and procedures and a new Helpdesk process |
 |
Prepared
and participated in business planning and organizational restructuring
|
 |
Participated
in preparing a Strategic Plan for the Department |
Alberta Health & Wellness - Alberta we//net project - September 1998 - September 2000
Project Management - Operations & Infrastructure
 |
Provide
Operations planning, design and policy development for the Alberta
Health & Wellness, Alberta we//net project |
 |
Provide
operations liaison with the Alberta we//net Project office and Alberta
Health & Wellness operations group |
 |
Manage
and support the various projects' development and testing environments
(many of the projects are Web enabled applications) |
 |
Manage
AIX System Administrator, Oracle DBA, Desktop Specialist and a number
of other support specialists |
 |
Specified
and installed 4 RS6000s, 6 NT Servers and a Computing Center Network
Infrastructure |
 |
Created
a plan to transition servers to a High Availability environment
|
 |
Developed
Operations Architecture Manual and various Operations policies and
procedures |
 |
Participate
in Systems Architecture design and project specific designs
|
 |
Participate
in Network and Operations Security policy and procedure development
|
 |
Participate
in a Province wide network implementation
|
Telus Mobility - March 1998 - August 1998
Interim Management
 |
Provided
ongoing technical and operations support
|
 |
Provided
guidance and assistance in contracting for out-sourcing all Operations
functions including Help Desk, Systems Administration, Network Administration,
and the Management function itself
|
 |
Managed
Unix System Administrators (2), NT Systems Administrators (2), Helpdesk
& Desktop Support Specialists (10) and a number of other support
specialists
|
 |
Implemented
a complete network redesign and rewiring as well as a server consolidation
|
 |
Developed
Operations policies and procedures and a Change Control process
|
 |
Participated
in Operations Outsourcing negotiations
|
Alberta Department of Energy - April 1997 - February 1998
Operations Management
 |
Provided
management and transition support for the MRIS system
|
 |
Managed
Sun Solaris System Administrators (3) and Systems Operators (2)
|
 |
Developed
Operations policies and procedures
|
 |
Successfully
transitioned the Systems Operation function back into the Department
|
Alberta Department of Energy -
MRIS Project - June 1994 - March 1997
Project
Management - Operations & Infrastructure
 |
Provide
technical and operations support for Development, Testing, Migration
and Production environments with a team of senior systems resources
|
 |
A
member of the Project Management Team and responsible for operations
planning, scheduling; policy and procedures development
|
 |
Client
liaison with the Alberta Department of Energy
|
 |
Managed
Sun Solaris System Administrators (3), Sybase DBA's (4), Systems Operators
(3) and a Migration Coordinator
|
 |
Specified
& installed 2 Sun Sparc Enterprise Servers and a Network Infrastructure
and upgraded the equipment twice over the course of the project
|
 |
Developed
Migration Manual and procedures and various Operations policies and
procedures
|
 |
Participated
in Systems Architecture design and redesign as well as project specific
designs
|
Elections Canada - September 1992 - October 1992
Operations Management
 |
Managed
and administered an Elections Canada Voter Registration system
|
 |
Installed,
tested and operated the hardware / software environment
|
 |
Trained
and supervised eight (8) data entry staff
|
 |
Significant
system change resulted from deficiencies identified by me to Elections
Canada
|
Employment
Experience:
Government of Alberta, PWSS
-
November 1992 - June 1994
Senior
System Analyst / Administrator
 |
Managed and administered a VAX Cluster
for Alberta Environment
|
 |
Recovered 85% of disk space and eliminated
the need to increase capacity
|
 |
Reduced boot process from 35 minutes
to 5 minutes
|
 |
Supported Alberta wide Forest Fire
network facilities
|
Victoria & Box Hill Colleges, Melbourne Australia - September 1991 - April 1992
Secondment - Subject Matter Specialist
 |
Assisted with the implementation of
a Computer Managed Learning system for Distance Delivery of Technical
programs by Victoria and Box Hill Colleges
|
 |
Provided consulting services to several
Colleges in Australia
|
 |
Lectured at 30+ Colleges and Universities
throughout Australia
|
 |
Conducted research with Colleges and
Universities in Alberta to create a comprehensive catalogue on Computer
Managed Learning materials and test banks available and a list of
contacts
|
 |
Prepared and presented a report to
the Minister of Advanced Education on my impressions of the Australian
Post Secondary Education System
|
Fairview College -
September 1985 - September 1991
Manager,
Computing Services
 |
Provided technical and management support
for all Academic and Administrative computing
|
 |
Established hardware and software standards
and policies and equipment replacement plans
|
 |
Installed a "state of the art"
digital PABX for voice and data communications
|
 |
Managed and administered a VAX Cluster
supporting Administrative and Academic computing
|
 |
Established a wide area network and
remote learning sites in support of Distance Learning
|
Agriculture Canada, Beaverlodge Research Station -
June 1984 - August 1985
Systems
Manager
 |
Provided the sole technical and management
support to 25 + researchers
|
 |
Conducted extensive software compatibility
testing of VMS 4.0 with all Agriculture Canada software for National
Headquarters
|
 |
Established a five year hardware /
software acquisition plan for the station
|
Corrections Canada - National Headquarters -
January 1981 - May 1984
Project
Manager / Acting Manager, Operational Information Systems
 |
Designed and implemented a National
telecommunications network connecting all Prisons and National Parole
offices in Canada (supported 80+ locations and 1000+ terminals)
|
 |
Implemented the second Facilities Outsourcing
contract in the Federal Government
|
 |
Acted as the Manager, Operational Information
Systems for 9 months and managed a staff of 20+ Technical resources
and 40+ clerical resources
|
Corrections Canada, Regional Headquarters -
September 1977 - December 1980
Regional
Manager, Operational Information Systems
 |
Provided the sole technical and management
support to the Prairie Region and the Regional Headquarters
|
 |
Reorganized the Administrative Division
and implemented Freedom of Information legislation throughout the
Prairie Region
|
 |
Developed and implemented a new Inmate
Information system requiring extensive liaison with RCMP and National
Parole Board
|
 |
Implemented Privacy legislation in
the Prairie Region
|
SED Systems -
April 1977 - August 1977
Systems
/ Analyst
Potash Corporation of Saskatchewan
-
July 1976 - March 1977
Programmer
/ Analyst
Canada Safeway Ltd.
-
January 1973 - August 1975
Computer
Operator
Teaching / Training Experience:
 |
Part-time Instructor at Fairview College;
Telecommunication & Networks, Systems Analysis & Design, Introduction
to Computing and specialty lectures.
|
 |
Guest speaker to Chambers of Commerce
in Fairview, Peace River and High Level on the general use of Computing
Technology for small business.
|
 |
Guest Lecturer at 30+ Colleges and
Universities in Australia on the subject of Computer Managed Learning
and its use in Distance Education.
|
Technical Experience:
 |
Experienced in all Systems Management
disciplines, Capacity Planning, Disaster Recovery Planning,
Security, Change Management and ITIL processes and best practices.
|
 |
System Manager level experience with
Digital Equipment VMS and Open VMS.
|
 |
Network Manager level experience with
LAN and WAN networks.
|
 |
Operations Manager level experience
with UNIX and NT systems and Sybase DBMS
|
Educational Experience:
 |
Diploma, Computer Technology
(1976) - Southern
Alberta Institute of Technology (S.A.I.T.)
|
 |
ITIL Fundamentals Nov/04
|
 |
Project Management Fundamentals (IBM)
July/98
|
 |
Private Pilot license - July/89
|
|
|